Clients / City of Petaluma

Project Dates: August 2007 – February 2008
Project Costs: Construction Cost $2,400,000

The Hanna Group provided full Construction Management services to the City of Petaluma on this pavement reconstruction and streetscape project.

The project entailed the reconstruction of approximately one mile of roadway, upgrading sidewalk and ramps to meet current ADA standards, and the reconfiguration of the striping configuration to include a safer, more pedestrian friendly road diet.

THG’s scope of work consists of providing Construction Management services including but not limited to the following:

  • Resident Engineering
  • Construction Inspection
  • Constructability Review
  • CPM Schedule Review
  • RFI & Submittal Review
  • Change Order Drafting
  • Monthly Estimate Preparation

Items of work included grinding, asphalt paving, ADA ramps, concrete sidewalk, striping, signage, lighting, in-pavement crosswalk lights, benches, trees, utilities, traffic signal installation, and detector loops.

This project was funded using Federal and State funds through the Caltrans Local Assistance Program. Local funds were also used for matching purposes.